 |
Home
News
Principle
Safe
Compact
Innovative
Reliable
No Storage
Options
Applications
Installations
Download
Links
Contact
Impressum
© 2004-2007 |
 |
Safety without compromise:
The top criteria for the development of the units was to ensure
the safety of the units under all operation conditions. This
was verified through independent testing by independent accredited
institutions (such as C-Mark, Netherlands) considering applicable
to CE standards.
The units further conform to OeNorm M5879-4 „Requirements
of chlorination equipment for water treatment“, particularly
considering section 4: Electro-chemical processes for the production
on site of disinfecting chlorine compounds.
In Germany the safety requirements laid out by the GUV (Gemeindeunfallversicherungsverband)
Nordrhein-Westfalen have been respected.
The NSF approval is also in preparation.
• Safety is first of all increased by operating the
units de-pressurized. The cell and the other components are
generally working under vacuum but nowhere under pressure which
minimized breakage and wear.
• Further multiple safety features are installed in
the WAPOTEC® ZilvoldHF Electrolysis units to control all
relevant checkpoints through a microprocessor controlled PLC.
• The double shell design of the cell block with integrated
cooling offers maximized safety, enable a production on a high
production level without overheating and potential damage for
the cell. It further eliminates leakage risks.
• The hydrogen formed is directly released to the open
air, avoiding any contact with air inside the building.
An adequate plant room ventilation and chlorine gas detection
sensor can create additional safety precautions for the operation.
 |
 |